當(dāng)前位置:希尼爾首頁 > 翻譯新聞 >
公司中標(biāo)上市公司國際招標(biāo)翻譯工作
公司中標(biāo)上市公司國際招標(biāo)翻譯工作
編輯:青島希尼爾翻譯公司 | 發(fā)布時間:2019-05-27 |
公司今日再次中標(biāo)國內(nèi)鋼鐵上市公司翻譯招標(biāo),在10余家翻譯公司中脫穎而出,獲得客戶的充分認(rèn)可,現(xiàn)將評標(biāo)標(biāo)準(zhǔn)摘錄如下,看看公司是如何獲得高分的。
評標(biāo)委員會對通過技術(shù)評議的投標(biāo)人進(jìn)行綜合評分步驟,即:商務(wù)評價、服務(wù)評價?技術(shù)評價?價格評價。Bids which are validated in technical review shall be subject to the following comprehensive scoring procedures: commercial review, service review, technical review and price review.
投標(biāo)人綜合得分=商務(wù)評議(權(quán)重10%)+服務(wù)評議(權(quán)重10%)+技術(shù)評議得分(權(quán)重40%)+價格評議得分(權(quán)重40%) 具體評價標(biāo)準(zhǔn)見附件1、2、3、4。 Comprehensive score = Commercial review (weighting 10%) + service review (weighting 10%) + technical review (weighting 40%) + price review (weighting 40%).
附件1、商務(wù)評價表(權(quán)重10%)
序號 |
內(nèi)
容 |
標(biāo)準(zhǔn)分 |
投標(biāo)人名稱 |
|||||
|
|
|
|
|
||||
1 |
業(yè)績(共40分,根據(jù)下列標(biāo)準(zhǔn)評分) 自2004年1月1日起至開標(biāo)日的國內(nèi)鋼鐵廠1780mm以上的生產(chǎn)線及以上同類工程業(yè)績 |
40分 |
|
|
|
|
|
|
最低分為0分,最高分為40分
提供整套生產(chǎn)線技術(shù)業(yè)績最多者為滿分,其余按照名次得分,得分值以幾何級數(shù)遞減,最后名次為0分。 |
|
|
|
|
|
|
||
2 |
付款條件及方式:付款條件最優(yōu)者得滿分,次優(yōu)者滿分基礎(chǔ)上減2分,第三優(yōu)者在滿分的基礎(chǔ)上減4分,以此類推。
符合招標(biāo)文件要求的付款條件和方式,得最高評價值。在此基礎(chǔ)上,將按照招標(biāo)文件中規(guī)定的利率計(jì)算提前支付所付的利息(及招標(biāo)人可能增加的風(fēng)險),并按照投標(biāo)資料表的規(guī)定,依據(jù)利息值多少降低評價值。 |
20分 |
|
|
|
|
|
|
3 |
近五年來企業(yè)狀況、正在執(zhí)行合同情況及履約能力。(投標(biāo)書中要有資料支持) |
由評標(biāo)委員會成員獨(dú)立對投標(biāo)人該項(xiàng)評價內(nèi)容進(jìn)行排序(排序序號為從“ |
20 |
|
|
|
|
|
4 |
合作承諾、項(xiàng)目執(zhí)行措施 |
20 |
|
|
|
|
|
Appendix 1:
Commercial Evaluation Table (weighing 10%)
No. |
Contents |
Standard score |
Name of
bidder |
|||||
|
|
|
|
|
||||
1 |
Performance (full score
40, the scoring shall be based on the following standard) From January 1, 2004 to
the bid opening date, domestic steel plant has production line more
than 1780mm and more superior engineering performance
|
40
|
|
|
|
|
|
|
The lowest score is 0 and
highest score is 40 The bidder who may provide
the complete production line shall have the full score in technical
performance. The score of other bidders shall be given according to
the ranking. The score shall decrease geometrically and the score of
the last place shall be 0. |
|
|
|
|
|
|
||
2 |
Payment conditions and mode:
The bidder who offers the optimal payment conditions shall get the
full score. The one in the second place shall get a score which is 2
points less than the full score, the one in the third place shall
get a score which is 4 points less than the full score and
accordingly. The bidder who offers
payment conditions and mode in full compliance with provisions of
the Tender Document shall get the full score. On this basis, the
interest (together with possible more risks on the part of the
Tenderee) to be paid in advance shall be determined using the
interest rate specified in the Tender Document. The evaluation value
shall be decreased according to the interest value and in accordance
with provisions of the table on biding materials. |
20
|
|
|
|
|
|
|
3 |
Corporate conditions of last
five years, contracts under performance and performance capacity.
(these shall be supported by materials given together with the bid) |
Each member of the committee
shall independently sort the bidders in respect of this evaluation
content (the ranking number shall be a whole number starting from
“1”. The one ranked first shall be numbered “1”, the one ranked
second shall be numbered “2” and accordingly). The average of
ranking numbers shall be sorted in an ascending order. The one
ranked first shall get a score of 20, the one ranked second shall
get a score of 10 and the one ranked third and subsequent places
shall get a score of 0. |
20 |
|
|
|
|
|
4 |
Cooperation commitments and
project implementation measures |
20 |
|
|
|
|
|
附件3、服務(wù)評價表(權(quán)重10%)
序號 |
項(xiàng)目 |
標(biāo)準(zhǔn)分 |
分項(xiàng)項(xiàng)目 |
分項(xiàng)標(biāo)準(zhǔn)分 |
說明 |
1 |
圖紙資料供應(yīng) |
40 |
資料的齊全程度 |
17 |
由評標(biāo)委員會成員獨(dú)立對投標(biāo)人該項(xiàng)評價內(nèi)容進(jìn)行排序(排序序號為從“ |
資料的內(nèi)容深度 |
17 |
由評標(biāo)委員會成員獨(dú)立對投標(biāo)人該項(xiàng)評價內(nèi)容進(jìn)行排序(排序序號為從“ |
|||
參考圖紙資料的數(shù)量 |
6 |
由評標(biāo)委員會成員獨(dú)立對投標(biāo)人該項(xiàng)評價內(nèi)容進(jìn)行排序(排序序號為從“ |
|||
2 |
人員派遣 |
30 |
設(shè)計(jì)各階段人員派遣的合理性,滿足設(shè)計(jì)結(jié)合要求 |
10 |
由評標(biāo)委員會成員獨(dú)立對投標(biāo)人該項(xiàng)評價內(nèi)容進(jìn)行排序(排序序號為從“ |
合作制造階段人員派遣的合理性,滿足設(shè)備監(jiān)制要求 |
5 |
由評標(biāo)委員會成員獨(dú)立對投標(biāo)人該項(xiàng)評價內(nèi)容進(jìn)行排序(排序序號為從“ |
|||
現(xiàn)場安裝、調(diào)試階段人員派遣的合理性,滿足設(shè)備安裝調(diào)試要求 |
15 |
由評標(biāo)委員會成員獨(dú)立對投標(biāo)人該項(xiàng)評價內(nèi)容進(jìn)行排序(排序序號為從“ |
|||
3 |
人員培訓(xùn) |
20 |
理論培訓(xùn) |
6 |
由評標(biāo)委員會成員獨(dú)立對投標(biāo)人該項(xiàng)評價內(nèi)容進(jìn)行排序(排序序號為從“ |
業(yè)績工廠培訓(xùn) |
6 |
由評標(biāo)委員會成員獨(dú)立對投標(biāo)人該項(xiàng)評價內(nèi)容進(jìn)行排序(排序序號為從“ |
|||
現(xiàn)場培訓(xùn) |
8 |
由評標(biāo)委員會成員獨(dú)立對投標(biāo)人該項(xiàng)評價內(nèi)容進(jìn)行排序(排序序號為從“ |
|||
4 |
備件提供 |
10 |
提供的一年備件清單的完整性、合理性 |
5 |
由評標(biāo)委員會成員獨(dú)立對投標(biāo)人該項(xiàng)評價內(nèi)容進(jìn)行排序(排序序號為從“ |
提供的調(diào)試備件清單的完整性、合理性 |
5 |
由評標(biāo)委員會成員獨(dú)立對投標(biāo)人該項(xiàng)評價內(nèi)容進(jìn)行排序(排序序號為從“ |
Appendix 3:
Service Evaluation Table (weighing 10%)
No. |
Items |
Standard score |
Sub-items |
Standard score of sub-items |
Descriptions |
1 |
Supply of
drawings |
40 |
Completeness of
materials |
17 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of
17, the one ranked second shall get a score of 10, the one
ranked third shall get a score of 3 and subsequent places shall
get a score of 0. |
Depth of contents of
materials |
17 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of
17, the one ranked second shall get a score of 10, the one
ranked third shall get a score of 3 and subsequent places shall
get a score of 0. |
|||
Quantity of drawings for
reference |
6 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of 6,
the one ranked second shall get a score of 3, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
|||
2 |
Dispatch
of personnel |
30 |
Rationality in personnel
dispatch during each design stage, meeting design needs |
10 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of
10, the one ranked second shall get a score of 5, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
Rationality in personnel
dispatch during cooperative manufacturing stage, meeting
equipment manufacturing supervision requirements |
5 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of 5,
the one ranked second shall get a score of 3, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
|||
Rationality in personnel
dispatch during on-site installation and commissioning stage,
meeting equipment installation & commissioning requirements |
15 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of
15, the one ranked second shall get a score of 10, the one
ranked third shall get a score of 5 and subsequent places shall
get a score of 0. |
|||
3 |
Training
of personnel |
20 |
Theoretical training |
6 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of 6,
the one ranked second shall get a score of 3, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
Plant training on
performances |
6 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of 6,
the one ranked second shall get a score of 3, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
|||
On-site training |
8 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of 8,
the one ranked second shall get a score of 4, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
|||
4 |
Supply of
spare parts |
10 |
Completeness and
rationality of list of spare parts for use for one year |
5 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of 5,
the one ranked second shall get a score of 3, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
Completeness and
rationality of list of spare parts for equipment commissioning |
5 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of 5,
the one ranked second shall get a score of 3, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
來源:青島希尼爾翻譯公司http://www.myfavoritepainters.net,轉(zhuǎn)載請注明出處